Every step of your cosmetic manufacturing process covered by a single, synchronized equipment package — no integration headaches, no compatibility issues.
Built for OEM Scale & Compliance
Each machine in the Kosmix line is designed to integrate seamlessly and independently — standard PLC interfaces, 316L stainless contact parts, CIP-ready.
Questions OEM Buyers Ask Before Ordering
Everything you need to know before requesting a quote — answered plainly.
What certifications does the production line carry?
All Kosmix machines carry CE marking (Machinery Directive 2006/42/EC) and are manufactured under ISO 9001:2015. Material test certificates (EN 10204 3.1) are provided for all 316L stainless product-contact parts. Full IQ/OQ documentation is available to support FDA 21 CFR Part 211 and EU GMP Annex 15 validation.
Can the line handle both low-viscosity serums and thick creams?
Yes. The vacuum emulsifying mixer handles viscosities from 50 cP (watery serums) to over 100,000 cP (thick ointments). The filling machine uses interchangeable nozzle heads — piston for thick creams, peristaltic for liquids — and the changeover takes under 15 minutes. You can run different SKUs on the same line within a single shift.
What is the minimum order for a complete production line?
There is no minimum order quantity. We supply everything from single-machine replacements to full turnkey lines. For the complete 4-stage line, the Starter Package starts at one unit. We recommend the Professional Line for OEM factories producing more than 50,000 bottles per month.
How long does on-site installation and commissioning take?
For the Starter Line, typically 3–5 working days. Professional and Industrial Lines require 7–14 working days including operator training. A detailed pre-installation checklist — covering floor space, utilities (3-phase power, compressed air, drainage), and site access — is provided 2 weeks before machine dispatch.
Does Kosmix supply spare parts internationally?
Yes. We stock a full range of consumable and wear parts — seals, gaskets, filling nozzles, and filter membranes — and ship via DHL Express worldwide within 48 hours. A recommended first-year spare parts kit can be included with your line order at a discounted rate.
Can I see a running line before purchasing?
Absolutely. We can arrange a video call with a live factory demonstration, or connect you with a reference customer in your region. For orders above a qualifying value, we cover the cost of a factory visit (flight and hotel) for one engineer from your team.
Is the RO system sufficient for EU/US cosmetic water standards?
Yes. The KM-RO system produces water with conductivity below 10 μs/cm and bacterial counts below 100 CFU/mL — meeting ISO 22716 (GMP for cosmetics), USP <1231>, and EU Cosmetics Regulation (EC) No 1223/2009. An EDI polishing module is available for pharmaceutical-grade standards.
What payment terms and shipping options are available?
Standard payment: 50% deposit on order confirmation, 50% balance before shipment . We ship EXW, FOB Guangzhou, or CIF to major ports worldwide. Full export documentation including CO, packing list, and commercial invoice is prepared within 3 working days of payment clearance.
Tell us your target capacity and product types. We'll send you a preliminary equipment layout and indicative pricing within 24 hours — no commitment required.